Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf Author: Manoj Samant Keywords/Tags: PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Author: Manoj Samant Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Author: Thomas F. Landon Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf Author: manoj.samant Keywords/Tags: bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls Author: Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary Keywords/Tags: SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf Author: Stephen Gill, CO-OPS Keywords/Tags: NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Author: Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Author: Adam Grodsky;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Author: Manoj Samant, Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Author: Thomas F. Landon Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf Author: Warren Krug Keywords/Tags: SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf Author: Jason Standridge Keywords/Tags: geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf Author: SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf Author: CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Author: Chris McGrath Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf Author: U.S. Department of Commerce Keywords/Tags: expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Author: Sutron Corporation Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Author: Darren Wright, James Sprenke, Charles Payton Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Author: Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Author: Adam Grodsky, COET Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Author: Keywords/Tags: |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Author: Scott Mowery Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf Author: Keith Brkich;Nathan Holcomb Keywords/Tags: SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Author: Nathan Holcomb Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.1.4_WaterTempComparisonSOP.pdf Author: yumiko Keywords/Tags: SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Author: Jason Standridge Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Author: Adam Grodsky Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf Author: Adam.Grodsky@noaa.gov Keywords/Tags: SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf Author: Caleb Gostnell, SIL Keywords/Tags: SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Author: Adam Grodsky;Richard Bourgerie Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
7.3.B.1.1_C-MIST_User_Manual.pdf Author: Paul Fanelli;CECAT Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |
Filename | Author | Keywords/Tags |
---|---|---|
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf | George Leigh, Kevin Bashant, NGS | concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf | George Leigh, Kevin Bashant, NGS | outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf | Manoj Samant | PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf | Manoj Samant | SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf | Thomas F. Landon | bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf | manoj.samant | bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls | Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary | SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf | Stephen Gill, CO-OPS | NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf | Minilek Hailegeberel | SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf | Adam Grodsky;Minilek Hailegeberel | SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf | Manoj Samant, Minilek Hailegeberel | SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf | Thomas F. Landon | ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf | Warren Krug | SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf | Jason Standridge | geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf | SIL | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf | CIL | SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf | Chris McGrath | Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf | U.S. Department of Commerce | expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf | CO-OPS | Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf | Sutron Corporation | COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf | Darren Wright, James Sprenke, Charles Payton | SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf | Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf | Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf | Adam Grodsky, COET | SOM, station operation and maintenance, O&M, SRM, installation |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf | ||
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf | Scott Mowery | pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf | Keith Brkich;Nathan Holcomb | SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf | Nathan Holcomb | SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf | Caleb Gostnell | SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.1.4_WaterTempComparisonSOP.pdf | yumiko | SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf | Jason Standridge | SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf | Caleb Gostnell | SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf | Adam Grodsky | SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf | Adam.Grodsky@noaa.gov | SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf | Caleb Gostnell, SIL | SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf | Adam Grodsky;Richard Bourgerie | SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
7.3.B.1.1_C-MIST_User_Manual.pdf | Paul Fanelli;CECAT | dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |