CO-OPS Field Library

manuals, operating procedures, publications and more
View All

12 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf
Author: Paul Fanelli;CECAT
Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf
Author: Eddie Roggenstein
Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf
Author: Chris McGrath
Keywords/Tags: GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating
3.3.1.1_Submission_of_Documentation_to_ERB.pdf
Author: Manoj Samant, Bruce L. Servary, Jr.
Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
Filename Author Keywords/Tags
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf Paul Fanelli;CECAT dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Eddie Roggenstein maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf Chris McGrath GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Manoj Samant, Bruce L. Servary, Jr. template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
Last modified: 2024-02-22 16:00 UTC