CO-OPS Field Library

manuals, operating procedures, publications and more
View All

39 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf
Author: Robert Heitsenrether;OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf
Author: OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf
Author: Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf
Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf
Author: Adam Grodsky, COET
Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
cGNSS_Field_Installation_Guide.pdf
Author: Robert Heitsenrether
Keywords/Tags:
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf
Author: Winston Hensley, Christopher Haith, Robert Heitsenrether
Keywords/Tags:
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf
Author: Chris Paternostro
Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.5.3.1.A_eSite_User's_Guide.pdf
Author: Trevor.Mackessy-Lloyd
Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf
Author: Bruce Servary, OET
Keywords/Tags: goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf
Author: Richard.Edwing
Keywords/Tags: NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.6.F10_Currents_Risk_Assessment.pdf
Author: Manoj Samant
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf
Author: Warren Krug
Keywords/Tags: ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf Robert Heitsenrether;OSTEP FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf OSTEP FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Adam Grodsky, COET SOM, station operation and maintenance, O&M, SRM, installation
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
cGNSS_Field_Installation_Guide.pdf Robert Heitsenrether
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Winston Hensley, Christopher Haith, Robert Heitsenrether
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Chris Paternostro CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.5.3.1.A_eSite_User's_Guide.pdf Trevor.Mackessy-Lloyd eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf Bruce Servary, OET goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Christopher Paternostro ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf Richard.Edwing NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.6.F10_Currents_Risk_Assessment.pdf Manoj Samant FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf Warren Krug ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
Last modified: 2024-02-22 16:00 UTC