CO-OPS Field Library

manuals, operating procedures, publications and more
View All

15 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf
Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS)
Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf
Author: Bruce Sevary
Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf
Author: Seth Baldelli
Keywords/Tags: met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf
Author: CO-OPS Engineering Division;Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf George Leigh, Kevin Bashant, National Geodetic Survey (NGS) digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Bruce Sevary reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Christopher Paternostro ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Seth Baldelli met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf CO-OPS Engineering Division;Minilek Hailegeberel SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
Last modified: 2024-02-22 16:00 UTC