Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS) Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Author: Warren Krug;Kathleen Bailey Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Author: Bruce Sevary Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Author: Chris Paternostro Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Author: Seth Baldelli Keywords/Tags: met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf Author: Chris Paternostro Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf | George Leigh, Kevin Bashant, National Geodetic Survey (NGS) | digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf | Warren Krug;Kathleen Bailey | FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf | Bruce Sevary | reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf | Chris Paternostro | ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf | Christopher Paternostro | ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf | Seth Baldelli | met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf | Chris Paternostro | hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |