CO-OPS Field Library

manuals, operating procedures, publications and more
View All

3 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf
Author: Scott Mowery
Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf
Author: Caleb Gostnell (POB)
Keywords/Tags: engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
Filename Author Keywords/Tags
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Scott Mowery pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf Caleb Gostnell (POB) engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
Last modified: 2024-02-22 16:00 UTC