CO-OPS Field Library

manuals, operating procedures, publications and more
View All

55 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf
Author: Adam Grodsky;Richard Bourgerie
Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf
Author: Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf
Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf
Author: Darren Wright, James Sprenke, Charles Payton
Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf
Author: Adam Grodsky, COET
Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf
Author: George Leigh, Curtis Smith, National Geodetic Survey (NGS)
Keywords/Tags: 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf
Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS)
Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf
Author: George Leigh, Kevin Bashant, NGS
Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf
Author: George Leigh, Kevin Bashant, NGS
Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf
Author: Winston Hensley, Christopher Haith, Robert Heitsenrether
Keywords/Tags:
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.4.1.D_ARGOS_Recovery_SOP.pdf
Author: Chris Paternostro
Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.5.3.1.A_eSite_User's_Guide.pdf
Author: Trevor.Mackessy-Lloyd
Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf
Author: Chris McGrath
Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf
Author: Scott Mowery
Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf
Author: Adam Grodsky;Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf
Author: FOD Team Leads
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf
Author: Eddie Roggenstein
Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
6.3.2.1.4_WaterTempComparisonSOP.pdf
Author: yumiko
Keywords/Tags: SOM,Station Operation and Maintenance
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf
Author: Nathan Holcomb
Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf
Author: Christopher McGrath
Keywords/Tags: current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf
Author: Christopher Paternostro;Richard Bourgerie
Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf
Author: Bruce Sevary
Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf
Author: Seth Baldelli
Keywords/Tags: met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf
Author: Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
Keywords/Tags:
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf
Author: CO-OPS Engineering Division;Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf
Author: Manoj Samant, Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf
Author: Trevor Mackessy-Lloyd;Seth Baldelli
Keywords/Tags: Air Gap; Miros; WaterLog
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf
Author: Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf
Author: Chris McGrath
Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf
Author: Chris McGrath
Keywords/Tags: waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf
Author: Rachel Krasna, Steve Bassett
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Adam Grodsky;Richard Bourgerie SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Darren Wright, James Sprenke, Charles Payton SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Adam Grodsky, COET SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf George Leigh, Curtis Smith, National Geodetic Survey (NGS) 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf George Leigh, Kevin Bashant, National Geodetic Survey (NGS) digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf George Leigh, Kevin Bashant, NGS concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf George Leigh, Kevin Bashant, NGS outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Winston Hensley, Christopher Haith, Robert Heitsenrether
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Chris Paternostro CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.5.3.1.A_eSite_User's_Guide.pdf Trevor.Mackessy-Lloyd eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Chris McGrath Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf CO-OPS Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Scott Mowery pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Adam Grodsky;Minilek Hailegeberel SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf FOD Team Leads SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Eddie Roggenstein maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
6.3.2.1.4_WaterTempComparisonSOP.pdf yumiko SOM,Station Operation and Maintenance
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Nathan Holcomb SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Christopher McGrath current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Christopher Paternostro;Richard Bourgerie CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Bruce Sevary reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Christopher Paternostro ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Seth Baldelli met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf CO-OPS Engineering Division SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf CO-OPS Engineering Division;Minilek Hailegeberel SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Manoj Samant, Minilek Hailegeberel SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf Trevor Mackessy-Lloyd;Seth Baldelli Air Gap; Miros; WaterLog
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Minilek Hailegeberel SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Chris McGrath SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf Chris McGrath waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Rachel Krasna, Steve Bassett SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist