Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
| Document |
|---|
| 3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
| 3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf Author: CECAT Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
| Filename | Author | Keywords/Tags |
|---|---|---|
| 3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
| 3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf | CECAT | freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |