Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf Author: Engineering Division, CO-OPS Keywords/Tags: bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Author: Chris Paternostro Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Author: Jennifer Ewald Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf Author: Stephen Gill, CO-OPS Keywords/Tags: NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf Author: Warren Krug Keywords/Tags: xterm, log on, recover missing data, engineering bulletin |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf | Engineering Division, CO-OPS | bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf | Chris Paternostro | CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf | Jennifer Ewald | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf | Stephen Gill, CO-OPS | NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf | Warren Krug | xterm, log on, recover missing data, engineering bulletin |