CO-OPS Field Library

manuals, operating procedures, publications and more
View All

1 document found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
Filename Author Keywords/Tags
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
Last modified: 2024-02-22 16:00 UTC