CO-OPS Field Library

manuals, operating procedures, publications and more
View All

14 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf
Author: Adam Grodsky;Richard Bourgerie
Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf
Author: Chris Paternostro
Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
7.3.B.1.1_C-MIST_User_Manual.pdf
Author: Paul Fanelli;CECAT
Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf
Author: Christopher Paternostro;Richard Bourgerie
Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
Filename Author Keywords/Tags
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Adam Grodsky;Richard Bourgerie SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Chris Paternostro CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
7.3.B.1.1_C-MIST_User_Manual.pdf Paul Fanelli;CECAT dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Christopher Paternostro;Richard Bourgerie CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
Last modified: 2024-02-22 16:00 UTC